0161 3023670 sales@aaronaccess.co.uk

GRAVESEND STATION

We were approached by C Spencer Ltd in December 2013 to enquire if we could produce and install 300 meters of heritage designed railing. On acceptance of the order we then had 2 weeks to manufacture and erect the railing. we fitted the railing over a 7 night blockade in time for the grand opening of Gravesend Station. we worked together with their design team to ensure all componants complied with Network Rails standards and fitted in with the central island canopy.

GRAVESEND STATION image
  • PTS trained staff
  • Design Assistance
  • Short lead times
  • Full UK coverage
  • Back of platformLine fencing